Saab 9-5 + Saab 9-5 Cars + Governing bodies and operation receptions + Settings and routine maintenance of the car + Engine - Systems of cooling of the engine, heating, ventilation and air conditioning + System of cooling of the engine - Systems of heating, ventilation and air conditioning General information Removal and control unit installation by ventilation system with a heater and To/in, removal and installation of the broad valve Replacement of the valve of an otsechka of cooling liquid and it Ý/m the valve Removal and installation of the fan of a heater Removal and heat exchanger installation Removal, repair and To/in compressor installation Removal and installation of the sensor of temperature in salon Removal and installation of the step-by-step engine of a zaslonka of mixing of air and э / motor of a zaslonka of a mode of air circulation + the Power supply system and production of the fulfilled gases + Systems of electric equipment of the engine + Manual box of gear shifting + Automatic transmission + Coupling and power shafts + Brake system + Suspension bracket and steering + Body + Onboard electric equipment
|
Removal and control unit installation by ventilation system with a heater and To/in, removal and installation of the broad valve
|
- Empty heating system, having disconnected hoses from the heat exchanger. On models with To/in discharge К/В system.
- Remove the central section of the dashboard and forward seats (see. Head Body).
- Unbend a sexual covering and remove air lines under forward seats.
- Remove the dashboard (see. Head Body).
|
- Disconnect from a beam of the dashboard of a wire of grounding (6 on an illustration), cut cable couplers (7), give nuts and remove the average cable channel (8).
|
|
- Turn out 3 bolts and remove the holder of the relay.
|
- Turn out 4 screws of fastening of a steering column and remove it in collecting (see. Head Suspension bracket and steering).
|
- Turn out 4 bolts (13 on an illustration) and remove an arm of pedals.
|
- Turn out on 2 screws on each party (14 on an illustration) and remove two basic brackets of the central part of a beam of the dashboard.
- Remove the stabilizer (15 on an illustration) on the central support and turn out 8 bolts of the central support (16).
|
- Turn out on 2 bolts of external support (17 on an illustration) and remove a beam (18) dashboards.
|
|
- On models from AT separate the socket of the AT control unit and put it aside (19 on an illustration).
|
- Separate 4 sockets of the block of ventilation and heating from the passenger (20 on an illustration).
- Lift the receiver, going from an interkuler to the throttle case.
|
- Remove the holder Ý/m the valve of the perepuskny valve of nadduvayemy air. For this purpose at first uncover, then remove from the holder the socket and separate it then remove the holder from a partition of an impellent compartment and put aside.
|
|
- Disconnect two hoses from the heat exchanger (23 on an illustration) and tubes (24) To/in from the broad valve, previously having turned out the central bolt.
|
- Turn out 2 bolts and remove the broad valve.
|
- Disconnect drain hoses on both parties of the block of ventilation and heating.
|
|
- Turn out from an impellent compartment three screws of fastening of the block of ventilation and heating to a partition.
|
- Raise a back part of the block and deduce it from a support.
- Installation is made upside-down. Use new sealing rings.
|
|
|
|