Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- Power supply system and production of the fulfilled gases
   General information and security measures
   Sbrasyvaniye of pressure in fuel system
   + Power supply system of petrol engines
   + Power supply system of the diesel V6 engine
   - Systems of release and decrease in toxicity of the fulfilled gases
      General information
      Removal and installation of components of system of release of OG
      Removal and installation lambda probes
      Removal and installation of components of SAI system
      Removal and installation of components of EVAP system
      Removal and installation of the valve and EGR system tube
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of components of SAI system

The forward valve and forward submitting tube of SAI

 PERFORMANCE ORDER

  1. Remove the top cover of the engine (1 on an illustration) and a perepuskny tube with the valve (2).
  1. Separate the socket of the sensor of temperature/pressure (3 on an illustration), disconnect a turbokompressor tube from the case of a throttle (4), then поддомкратьте the car and disconnect a tube from an interkuler (5).
  2. Lower the car on the earth and lift the receiver a turbokompressor.
  1. Weaken a collar (7 on an illustration) hose fastenings to the SAI valve and if it is required to remove only the valve, turn out bolts (8) its fastenings.

The valve can be removed and after tube removal.

  1. At removal of a tube give fixture of the thermofilter of a final collector and remove the screen.
  1. Give fixture of a submitting tube to a forward final collector (3 bolts) and a head of cylinders (1 nut) and lift the receiver (11 on an illustration).
  1. If the forward SAI valve is not removed yet, remove it, having turned out bolts (12 on an illustration).
  2. Installation is made upside-down. Previously clear interfaced surfaces of the valve and a tube, use new laying.

The back valve and back submitting tube of SAI

 PERFORMANCE ORDER

  1. Separate sockets a lambda probes (see an illustration).
  1. Give fixture (2 on an illustration) a back tube of SAI to a final collector and a head of cylinders.
  1. Disconnect from the SAI valve a hose (3 on an illustration) and lift the receiver together with the valve.
  2. Turn out bolts (4 on an illustration) fastenings of the valve and separate it from a tube.
  3. Installation is made upside-down. Previously clear interfaced surfaces of the valve and a tube, use new laying.

Pump SAI

 PERFORMANCE ORDER

  1. To Poddomkratta the car also separate the socket of electroconducting of the pump SAI (2 on an illustration).
  1. Turn out bolts of fastening of the pump SAI, disconnect from it hoses and remove the pump (3 on an illustration).
  2. Installation is made upside-down. Be convinced that plugs of fixing openings of the pump are established correctly and do not drop out.

SAI filter

 PERFORMANCE ORDER

  1. Remove the pump SAI and the filter case (3 on an illustration).
  1. Remove the filter (4 on an illustration).
  2. Installation is made upside-down.